Modular energy platform

Power, cooling and heat for industry and data centres

Tehoasema combines local power generation, backup power, cooling, heat recovery and energy storage into an energy platform sized to the needs of each project.

Sized to the project's loads

Power, heat and cooling together

Heat and flexibility utilisation assessed site by site

Illustration of a modular energy plant connecting an industrial site and a data centre with energy storage and cooling; not a completed client reference.
Why Tehoasema

Energy infrastructure that enables the project

Data centre and industrial projects in Finland need infrastructure that can be deployed quickly, scaled and operated efficiently. Grid connections, electricity price volatility, heat utilisation and security of supply directly affect project viability. Tehoasema helps turn energy infrastructure from a bottleneck into an enabler of the investment project.

Can accelerate project start-up when the grid connection is a constraint

Can improve energy efficiency and support waste heat utilisation

Enables joint optimisation of cooling and heat production

Can support local energy self-sufficiency and security of supply

Conditions for the benefits

What are the benefits based on?

The value of the energy platform comes from aligning technical solutions, local conditions and agreed responsibilities. The outcome is always assessed project by project.

Phased implementation

Modularity can support phased deployment. The schedule depends on the grid connection, permitting, equipment availability and commissioning tests.

Heat utilisation

The benefit requires sufficient heat demand, a suitable temperature level and an offtake arrangement that is technically and commercially feasible.

Flexibility and reserves

The benefit depends on sizing, control, spare capacity and market eligibility once the needs of critical loads have been met.

Illustrative concept

The same principle may apply to an industrial site or a data centre. The final structure is determined by the loads, reliability requirements, grid connection and heat offtake.

Power generation

Local generation complements the grid connection in an agreed way.

Energy storage and control

Storage and control smooth the load within the available capacity.

Industrial critical loads

The power, heat and reliability needs of processes guide the sizing.

Data centre critical loads

IT load, cooling and continuity requirements are handled as a whole.

Cooling and waste heat

Heat collected from cooling is routed to a heat pump when it is usable.

Heat pump and heat use

The temperature level is raised for the site's process or a heating network if offtake is feasible.

Spinning reserve means rapidly adjustable power from generation that is running and connected to the power system, used in disturbances or when the load changes. 

A preliminary assessment defines the required power and support duration, load profiles, state-of-charge management, control principles, heat offtake, and grid and reliability limits.

Implementation models

Two ways to implement the energy platform

The energy system of an industrial plant or data centre can be built as part of the site or as a separate energy station.

Energy solution integrated into the site

The energy platform is designed and integrated directly into the industrial plant's or data centre's own premises and automation. Power generation, backup power, cooling and heat recovery are sized to the site's own processes and critical loads.

  • Tailored to a single facility's premises, processes and backup power needs
  • Integrates with the building and production process systems
  • Suitable for new-build projects and for modernising existing infrastructure

Energy and cooling as a service (EaaS)

A separate energy station generates and supplies power, cooling, heat and backup power as an agreed service. The customer receives the energy services it needs without having to tie up capital or manage day-to-day energy generation itself.

  • Energy, cooling and backup power are supplied as an agreed service
  • Frees up the customer's capital and resources for its core business
  • Can serve a single site or several operators

In both models, ownership, the investment structure and responsibilities for operation and maintenance are agreed project by project according to the needs of the customer and partners.

Solutions

A modular system for power, heat and cooling

A system assembled from modules to suit the project's needs. The solution can be expanded as operations grow.

Explore solutions
Module A

Local power generation and backup power

Power supply to critical loads can be supported with generation sized to the site's needs.

Explore solution
Module B

Cooling systems

Cooling can be matched to the load and integrated into the energy system of an industrial site or data centre.

Explore solution
Module C

Heat pump systems

The temperature level of waste heat can be raised for local process, building or network use.

Explore solution
Module D

Heat recovery and district heating integration

Usable waste heat can be directed to the site's own use or to a heating network when the conditions for offtake are met.

Explore solution
Module E

Energy storage, flexibility and reserves

Storage, control and spinning reserve can smooth power and voltage peaks and support rapid load changes.

Explore solution
Module F

Project development and investment models

Technical options, design packages, responsibilities and the commercial model can be assessed before the investment decision.

Explore solution
Module G

Fuel systems

A basic fuel supply module for new and existing plants. The system can be expanded with additional modules as operations and fuel demand grow.

Module H

Carbon dioxide capture and adsorption cooling

A basic module for new and existing gas engine plants. The system can be expanded with additional modules as operations grow.

Built for the Finnish energy market

Is energy infrastructure the bottleneck in your project?

Let's discuss how Tehoasema could help deliver your data centre, industrial or energy investment.